page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77 page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
page 135
page 136
page 137
page 138
page 139
page 140
page 141
page 142
page 143
page 144
page 145
page 146
page 147
page 148
page 149
page 150
page 151
page 152
page 153
page 154
page 155
page 156
page 157
page 158
page 159
page 160
page 161
page 162
page 163
page 164
page 165
page 166
page 167
page 168
page 169
page 170
page 171
page 172
page 173
page 174
page 175
page 176
page 177
page 178
page 179
page 180
page 181
page 182
page 183
page 184
page 185
< prev - next > Energy Hydro power civil_works_guidelines_for_micro_hydro (Printable PDF)
CIVIL WORKS GUIDELINES FOR MICRO-HYDROPOWER IN NEPAL
75
Figure 5.5 Flushing settling basin using the vertical
flush pipe method
expansion (i.e., horizontally 1:2 or p = 26.5° as shown in
Figure 5.4, and vertically 1:1 as shown in Figure 5.3). Note
that if the settling basin is combined with the forebay, then
this zone is not necessary: the forebay structure can be directly
downstream of the settling zone.
The operating water level of the settling basin is generally
controlled at the outlet, sometimes by a weir which may be
designed to operate as submerged in order to conserve head.
5.3.7 FLUSHING ARRANGEMENTS
Vertical Hush pipe method
There are various ways of removing the stored sediment from
the settling basin. An appropriate method for micro-hydro
settling basins is the “vertical flush pipe”. This uses a detach-
able vertical mild steel pipe over a hole in the basin floor. A
drain pipe is fixed below the basin floor to convey the flow
out of the basin. When the vertical flush pipe is lifted, the
water stored in the basin and the incoming flow along with
the sediment are drained through the hole. Apart from being
simple, the other advantage of this system is that it can spill
Photo 5.3 Lifting the flushing mechanism (Jhong)
Photo 5.4 Jharkot settling basin
some excess flow such as during floods when the water level
in the basin is above the normal level. This vertical flush
method is shown schematically in Figure 5.5. The Galkot
settling basin is based on this method as can be seen in
Drawing 420/04/3C01 of Appendix C. Similarly, the jharkot
micro-hydro scheme also uses this method for flushing as can
be seen in Photograph 5.3. The diameter of the flush pipe is
governed by the following criteria:
a) Overflow capacity
It needs to spill the excess flood flow that enters the basin as
shown in Figure 5.6. This is governed by the weir equation,
where the perimeter of the pipe is used for the length as follows:
Qflood =ΠdCwhflood3/2
where:
Qflood is the expected flood flow in the basin
hflood is the depth of water above the vertical pipe during Qflood
This is the height between the top of the vertical flush pipe
and the top of the settling basin wall.
Cw is the weir coefficient for a sharp edged weir, which is 1.9
(see Table 3.3, Chapter 3). The reason for using the sharp
edged weir coefficient is because the pipe thickness is small
compared to the head.
In terms of the pipe diameter, the above equation can be
rewritten as follows:
d = Qflood / 1.9Πhflood 3/2
To ensure draining of excess flow and to prevent spilling of the
design flow the height of the vertical flush pipe should be such
that the top level is 50mm above the design water level. Also
note that if the settling basin is combined with the forebay,
it may be more important to size the flush pipe diameter such that
it is able to spill the design flow. This is because if the turbine
valve is closed during emergencies, the entire design flow will
have to be spilled from the forebay until the operator reaches the
intake or other control structures upstream of the forebay.